Baseline Swing Bridge Rehabilitation
Project Overview Baseline Structure is a 116m swing bridge comprising of a concrete tail arm span and all steel nose arm spanrotating about an off-center pier. The project consisted of the following major work: Structural Repairs: structural steel reinforcing to sidewalk brackets in tail span steel curb plate installs concrete curb replacement in tail span...
Read more →
Rehabilitation of Teslin River Bridge
Project Overview Work to be done under this contract consists of rehabilitation of the existing Teslin River Bridge, km 1296, AlaskaHighway #1, Yukon. The bridge is located in Johnson’s Crossing, Yukon. Location Km 1296, Alaska Highway #1 Value $1.9M Client Government of Yukon Highways and Public Works Consultant WSP Canada Group Ltd. Key Skills Applied...
Read more →
MTO North Region Northwest
Project Overview Bertrand Creek bridge and West White River bridge project consisted of following repairs: 1. Grading, Drainage, Granular base Road Shoulder repairs Place Rip-Rap and Geotextile Road Levelling Asphalt hot mix pavement Line Painting 2. Structural Repairs: Deck Joint Assemblies replacement Concrete patches on the barrier walls, soffit, deck, piers and abutment walls Bearing...
Read more →
King George VI Lift
Project Overview King George VI Structure is an all-steel double 25m bascule span lift bridge. The project consisted of the following major work: Structural Repairs: Structural steel replacement to bascule spans Concrete repairs to trunnion decks and sidewalks Sidewalk wearing surface Structural steel coating Mechanical Repairs: Complete high-speed span drive replacement Low-speed span drive rehabilitation...
Read more →
Walpole Bridge
Project Overview Walpole is a unique swing bridge that provides the only land-based access to Walpole island. Constructed in 1968, the bridge carries two lanes of traffic and two sidewalks over the Chenal Ecarte (Snye) River, a navigable waterway connecting Lake Huron to Lake Simcoe. The multi-faceted project includes rehabilitation on the swing span and...
Read more →
Donohue Bridge
Project Overview Donohue bridge — a vital overpass between the industrial sector and downtown Sarnia posed a unique challenge due to the unforeseen circumstances and appraisal that led to an increase of 250% in the requirements for workload and resources. The existing condition of the deck was in much worse shape and deterioration than anticipated...
Read more →
Saxony Condominiums
Project Overview Saxony Condominiums is a luxury 6-story condo building built by Landform Development Group in Burlington, Ontario near the lakeshore. With a metal-based structure and amenities and building features such as designed in metal – such as the roof Skydeck, canopies and entrance pathways, LCI was contracted to design, fabricate, supply and install their...
Read more →
The Big Otter Bridge
Project Overview The Big Otter is a steel bridge nestled in a traditional golf course in Tilsonburg, Ontario — carrying train tracks and traffic over the Lake Erie waterway named, “Big Otter Creek.” During this project, LCI completed jacking and structural steel repair to extend the lifespan of this beautiful bridge. Location Tilsonburg, ON Value...
Read more →
Thorold Tunnel
Project Overview Thorold Tunnel is an underwater passageway that was originally installed between 1965 and 1967. The tunnel carries Highway 58 underneath the Welland Canal. It is 840m in length and contains 2 separate tubes, one for each opposing directions of traffic, accommodating traffic and pedestrians to travel beyond and through the waterway. Within the...
Read more →
Brookdale Bridge
Project Overview Brookdale is a border bridge connecting the city of Cornwall to our neighboring country. During the rehabilitation of Brookdale bridge, a complex temporary support system was installed in order to support the live load on the bridge while rehabilitating the piers. LCI installed new expansion joints, waterproofing and paving of the deck and...
Read more →
Lord Selkirk Bridge
Project Overview Lord Selkirk is a lift-bridge originally built in the 1940’s is metal through girder with a double leaf bascule. LCI was contracted to installing new control panels, conduits and wiring to extend the life and use of the structure for up to 25 years and increase the safety and efficiency. This project involves...
Read more →